Handover

APD Scaffolding
Pear Tree Farm, Aveley RM15 4XL
Website: apdscaffolding.co.uk
Telephone: +44 7826 013009
Email: apdscaffolding@gmail.com
HANDOVER CERTIFICATE

Project & Certificate Details

Site Address
Scaffolding Type
Number of Lifts Boarded
Certificate No
Loadings (kN/m²)
Built in accordance with?
Dimensions provided?
Width (mtrs)
Height (mtrs)
Length (mtrs)
Have ties been tested?

Scaffolding Contractor

Scaffolding Contractor
APD Scaffolding
Name
As authorised signatory for APD Scaffolding
Inspector’s Signature
Date of Handover

Client / Principal Contractor Details

Client/Principal Contractor
Signature
Date

This is to certify that the scaffold has been erected in accordance with the Work at Height Regulations 2005 (as amended) and the NASC Technical Guidance TG20 for tube and fitting scaffolds.

This Handover Certificate does not indicate that the scaffolding has been inspected before use by a competent person as required by the WAH Regulations.

This scaffold must be inspected at intervals not exceeding seven days and after any event that may affect its adequacy. The scaffold must not be modified without authorisation under any circumstances. It is a main contractor’s responsibility to organise scaffold weekly inspections.

Notes & Photos

Notes
Photo attachments You can add multiple photos (auto-resized for PDF/print).